
Post-Hurricane Emergency Response
During the project’s first phase, Ensolum performed fungal assessments at over seventy-five buildings to develop a fungal remediation plan
During the project’s first phase, Ensolum performed fungal assessments at over seventy-five buildings to develop a fungal remediation plan
Ensolum was retained to perform an industrial hygiene exposure monitoring survey for an 800-employee paper mill.
Ensolum, LLC (Ensolum) industrial hygienists completed investigatory assessment within the retirement community structure following three (3) separate water release events.
Ensolum, LLC (Ensolum) industrial hygienists completed investigatory investigations within the mixed-use high-rise luxury Hotel/Condominium structure following eight (8) separate water release events.
Storm damages to warehouse. Ensolum is performing on site safety support for fall protection, boom lifts, scissor lifts, crane operations and safety plans.
On short notice, Ensolum performed a NORM survey to facilitate Railroad Commission of Texas (RRC) permit renewal required at the facility. The survey included variable measurements on aboveground storage tanks, washers and shakers.
Ensolum acted as the liaison between the client and private landowners at three proposed drilling sites to determine presence of private water wells.
These operators were required by August 1, 2022 to provide the RRC with an Emergency Operations plan (EOP) for it’s applicable facility.
Ensolum was engaged by a reputable engineering firm on behalf of their upstream client to evaluate the corrective actions performed by others following a release of crude oil.
The producer of the lease implemented water injection or flooding of the producing formation at the site beginning in the early 1990s to enhance the recovery of crude oil.